Tokyo Keiki Products

Filter
Showing 1141 - 1150 of 11942 items
  • Special switching valves for easy speed and torque switching.
  • Balanced vane motor for versatile performance
  • Compact design with high torque output
  • Smooth and stable low speeds, down to 10rpm
  • No need for gear boxes or reduction gears
  • Shaft: (R1) Parallel shaft with square key (standard)
  • Maximum Working Pressure: 14MPa
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.
  • Special switching valves for easy speed and torque switching.
  • Balanced vane motor for versatile performance
  • Compact design with high torque output
  • Smooth and stable low speeds, down to 10rpm
  • No need for gear boxes or reduction gears
  • Shaft: (R1) Parallel shaft with square key (standard)
  • Maximum Working Pressure: 14MPa
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.
  • Wide speed and torque range
  • Compact design with high torque output
  • Smooth and stable low speeds at 10 rpm
  • Eliminates the need for gear boxes.
  • Displacement: 398cm3/rev
  • Maximum Working Pressure: 14MPa
  • Theoretical Torque: 44N·m
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.

       

  • Wide speed and torque range
  • Compact design with high torque output
  • Smooth and stable low speeds at 10 rpm
  • Eliminates the need for gear boxes.
  • Displacement: 398cm3/rev
  • Maximum Working Pressure: 14MPa
  • Theoretical Torque: 44N·m
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.

       

  • Special switching valves for easy speed and torque switching.
  • Balanced vane motor for versatile performance
  • Compact design with high torque output
  • Smooth and stable low speeds, down to 10rpm
  • No need for gear boxes or reduction gears
  • Shaft: (R1) Parallel shaft with square key (standard)
  • Maximum Working Pressure: 14MPa
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.
  • Wide speed and torque range
  • Compact design with high torque output
  • Smooth and stable low speeds at 10 rpm
  • Eliminates the need for gear boxes.
  • Displacement: 298cm3/rev
  • Maximum Working Pressure: 14MPa
  • Theoretical Torque: 33N·m
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.

       

  • Special switching valves for easy speed and torque switching.
  • Balanced vane motor for versatile performance
  • Compact design with high torque output
  • Smooth and stable low speeds, down to 10rpm
  • No need for gear boxes or reduction gears
  • Shaft: (R1) Parallel shaft with square key (standard)
  • Maximum Working Pressure: 14MPa
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.
  • Special switching valves for easy speed and torque switching.
  • Balanced vane motor for versatile performance
  • Compact design with high torque output
  • Smooth and stable low speeds, down to 10rpm
  • No need for gear boxes or reduction gears
  • Shaft: (R1) Parallel shaft with square key (standard)
  • Maximum Working Pressure: 14MPa
  • Minimum Speed: 10min-1
  • Typical lead times range from 29-31 Weeks.
  • Tokyo Keiki D-DFRG Series Digital directional & flow control valve 
  • Bypass type pressure compensating valve (sizes 03 and 04) 
  • 3 directional control positions (neutral and 2 positions) 
  • Load sensing port available (lift circuit for sizes 04 and 06) 
  • Spool type: all ports closed in neutral position. 
  • Spring center type with built-in pressure reducing valve for external pilot operation. 
  • Out of Stock Models: Estimated Arrival 31 to 33 Weeks 

  • Tokyo Keiki D-DFRG Series Digital directional & flow control valve 
  • Bypass type pressure compensating valve (sizes 03 and 04) 
  • 3 directional control positions (neutral and 2 positions) 
  • Load sensing port available (lift circuit for sizes 04 and 06) 
  • Spool type: all ports closed in neutral position. 
  • Spring center type with built-in pressure reducing valve for external pilot operation. 
  • Out of Stock Models: Estimated Arrival 31 to 33 Weeks