Hydraulics

Filter
Showing 4241 - 4250 of 10303 items
  • Safety valve function for releasing excessive hydraulic pressure, ensuring circuit control. 
  • Solenoid valve enables pressure setting in 2-3 stages. 
  • Compatible with mineral oil-based and water-glycol based hydraulic fluids. 
  • Gasket-mounted solenoid controlled multi-pressure relief valve. 
  • Vent pressure options: standard or high. 
  • Drain options: standard internal or external. 
  • Safety valve function for releasing excessive hydraulic pressure, ensuring circuit control. 
  • Solenoid valve enables pressure setting in 2-3 stages. 
  • Compatible with mineral oil-based and water-glycol based hydraulic fluids. 
  • Gasket-mounted solenoid controlled multi-pressure relief valve. 
  • Vent pressure options: standard or high. 
  • Drain options: standard internal or external. 
  • Safety valve function for releasing excessive hydraulic pressure, ensuring circuit control. 
  • Solenoid valve enables pressure setting in 2-3 stages. 
  • Compatible with mineral oil-based and water-glycol based hydraulic fluids. 
  • Gasket-mounted solenoid controlled multi-pressure relief valve. 
  • Vent pressure options: standard or high. 
  • Drain options: standard internal or external. 
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Fluid type choices include Mineral Oil (standard) and Phosphate Ester (F3)  
  • Solenoid Control: Pilot operated, gasket mounting
  • Mounting: ISO 4401-AF-10-4-A
  • Spool/Spring: Types A, B, C, D, N
  • Electrical: Plug-in (G 1/2), DIN43650 (Pg. 11)
  • Max. Pressure: 21 MPa
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.