Filter

Productos

Filter
Showing 1881 - 1890 of 20478 items
  • Low noise (55 dB(A)), high durability, and 40% weight reduction vs. traditional models.
  • Max pressure: 7 MPa, displacement: 6.2 – 16.3 cm³/rev, speed: 600-1800 r/min.
  • Hydraulic fluids: ISO VG-32/46 compatible, suction pressure: -16.7 to +50 kPa.
  • Models: ARL1-6, ARL1-8, ARL1-12, ARL1-16.
  • Mounting options: Flange (6.8 kg) / Foot (9.0 kg).
  • Ideal for industrial hydraulics, machine tools, and automation.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Low noise (55 dB(A)), high durability, and 40% weight reduction vs. traditional models.
  • Max pressure: 7 MPa, displacement: 6.2 – 16.3 cm³/rev, speed: 600-1800 r/min.
  • Hydraulic fluids: ISO VG-32/46 compatible, suction pressure: -16.7 to +50 kPa.
  • Models: ARL1-6, ARL1-8, ARL1-12, ARL1-16.
  • Mounting options: Flange (6.8 kg) / Foot (9.0 kg).
  • Ideal for industrial hydraulics, machine tools, and automation.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Low noise (55 dB(A)), high durability, and 40% weight reduction vs. traditional models.
  • Max pressure: 7 MPa, displacement: 6.2 – 16.3 cm³/rev, speed: 600-1800 r/min.
  • Hydraulic fluids: ISO VG-32/46 compatible, suction pressure: -16.7 to +50 kPa.
  • Models: ARL1-6, ARL1-8, ARL1-12, ARL1-16.
  • Mounting options: Flange (6.8 kg) / Foot (9.0 kg).
  • Ideal for industrial hydraulics, machine tools, and automation.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.