Products

Filter
Showing 3741 - 3750 of 20099 items
  • Connection: Threaded (CPT/CPDT) or Sub-plate (CPG/CPDG)
  • Valve Sizes: 03, 06, 10
  • Rated Flow: 40–250 L/min (10.6–66.0 GPM)
  • Max Pressure: 25 MPa (3630 PSI)
  • Cracking Pressure: 0.04–0.5 MPa (6–70 PSI)
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Connection: Threaded (CPT/CPDT) or Sub-plate (CPG/CPDG)
  • Valve Sizes: 03, 06, 10
  • Rated Flow: 40–250 L/min (10.6–66.0 GPM)
  • Max Pressure: 25 MPa (3630 PSI)
  • Cracking Pressure: 0.04–0.5 MPa (6–70 PSI)
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Connection: Threaded (CPT/CPDT) or Sub-plate (CPG/CPDG)
  • Valve Sizes: 03, 06, 10
  • Rated Flow: 40–250 L/min (10.6–66.0 GPM)
  • Max Pressure: 25 MPa (3630 PSI)
  • Cracking Pressure: 0.04–0.5 MPa (6–70 PSI)
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.
  • Hydraulic Fluid: F3 Phosphate Ester for optimal efficiency and durability.
  • High torque low speed internal gear motors CR Series
  • Motor displacement code
  • Various mounting selection
  • Porting Options: S, P, G for seamless integration
  • Various Shaft End Configurations to suit diverse needs.
  • Typical lead times range from 23-26 Weeks.