Products

Filter
Showing 1321 - 1330 of 20072 items
  • Seal Kit for Tokyo Keiki P16V-RSTU Piston Pump.
  • Tokyo Keiki (Tokimec)
  • Seal Kit for Tokyo Keiki F11-P16/21VM(F)R Piston Pump.
  • Tokyo Keiki (Tokimec)
  • Seal Kit for Tokyo Keiki F11-P21V / 31V Piston Pump.
  • Tokyo Keiki (Tokimec)
  • Seal Kit for Tokyo Keiki P31VR (S238) Piston Pump.
  • Tokyo Keiki (Tokimec)
  • Seal Kit for Tokyo Keiki P16VMR (S238) Piston Pump.
  • Tokyo Keiki (Tokimec)
781H-VK311708-2 | Spool 2B2 for DHG-06-50 781H-VK311708-2 | Spool 2B2 for DHG-06-50
30%
  • Pilot Operated Directional Valve
  • Precise flow management under high-pressure conditions.
  • Versatile Configurations: Spring-centered, pressure-centered, no-spring, and spring-offset models.
  • ISO 4401-compliant with options like built-in orifices and stroke adjustments.
  • Valve Sizes: DHG-04, DHG-06, DHG-10; Max Pressure: 31.5 MPa (4,570 PSI)
  • Flow Rates: Up to 1,100 L/min (291 GPM)
  • Ideal for manufacturing, construction, and energy industries.
  • Enhanced Reliability: Seal kits and pilot choke valves extend lifespan and functionality
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please get in touch with us to explore additional options.
781H-VK311709-0 | Spool 2B3 for DHG-06-50 781H-VK311709-0 | Spool 2B3 for DHG-06-50
30%
  • Pilot Operated Directional Valve
  • Precise flow management under high-pressure conditions.
  • Versatile Configurations: Spring-centered, pressure-centered, no-spring, and spring-offset models.
  • ISO 4401-compliant with options like built-in orifices and stroke adjustments.
  • Valve Sizes: DHG-04, DHG-06, DHG-10; Max Pressure: 31.5 MPa (4,570 PSI)
  • Flow Rates: Up to 1,100 L/min (291 GPM)
  • Ideal for manufacturing, construction, and energy industries.
  • Enhanced Reliability: Seal kits and pilot choke valves extend lifespan and functionality
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please get in touch with us to explore additional options.
781H-VK313740-3 | Cover for DHG-06 781H-VK313740-3 | Cover for DHG-06
30%
  • Pilot Operated Directional Valve
  • Precise flow management under high-pressure conditions.
  • Versatile Configurations: Spring-centered, pressure-centered, no-spring, and spring-offset models.
  • ISO 4401-compliant with options like built-in orifices and stroke adjustments.
  • Valve Sizes: DHG-04, DHG-06, DHG-10; Max Pressure: 31.5 MPa (4,570 PSI)
  • Flow Rates: Up to 1,100 L/min (291 GPM)
  • Ideal for manufacturing, construction, and energy industries.
  • Enhanced Reliability: Seal kits and pilot choke valves extend lifespan and functionality
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please get in touch with us to explore additional options.
781H-VK317026-3 | Cover for DHG-06-2B* 781H-VK317026-3 | Cover for DHG-06-2B*
30%
  • Pilot Operated Directional Valve
  • Precise flow management under high-pressure conditions.
  • Versatile Configurations: Spring-centered, pressure-centered, no-spring, and spring-offset models.
  • ISO 4401-compliant with options like built-in orifices and stroke adjustments.
  • Valve Sizes: DHG-04, DHG-06, DHG-10; Max Pressure: 31.5 MPa (4,570 PSI)
  • Flow Rates: Up to 1,100 L/min (291 GPM)
  • Ideal for manufacturing, construction, and energy industries.
  • Enhanced Reliability: Seal kits and pilot choke valves extend lifespan and functionality
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please get in touch with us to explore additional options.
781H-VK412453-3 | Spring for DHG-06 781H-VK412453-3 | Spring for DHG-06
30%
  • Pilot Operated Directional Valve
  • Precise flow management under high-pressure conditions.
  • Versatile Configurations: Spring-centered, pressure-centered, no-spring, and spring-offset models.
  • ISO 4401-compliant with options like built-in orifices and stroke adjustments.
  • Valve Sizes: DHG-04, DHG-06, DHG-10; Max Pressure: 31.5 MPa (4,570 PSI)
  • Flow Rates: Up to 1,100 L/min (291 GPM)
  • Ideal for manufacturing, construction, and energy industries.
  • Enhanced Reliability: Seal kits and pilot choke valves extend lifespan and functionality
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please get in touch with us to explore additional options.