Yuken Products

Filter
Showing 151 - 160 of 3788 items
  • Unloading Relief Valve.
  • Auto pump unloading/reloading for accumulator & high-low circuits
  • Pressure ranges: B (2.5–7.0 MPa), C (3.5–14 MPa), H (7.0–21 MPa)
  • Max pressure: 21 MPa (3050 PSI)
  • Max flow: BUCG-06: 125 L/min
  • Mounting: Sub-plate (Rc, BSP, NPT)
  • Seal: Phosphate ester fluid compatible
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Unloading Relief Valve.
  • Auto pump unloading/reloading for accumulator & high-low circuits
  • Pressure ranges: B (2.5–7.0 MPa), C (3.5–14 MPa), H (7.0–21 MPa)
  • Max pressure: 21 MPa (3050 PSI)
  • Max flow: BUCG-06: 125 L/min
  • Mounting: Sub-plate (Rc, BSP, NPT)
  • Seal: Phosphate ester fluid compatible
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Unloading Relief Valve.
  • Auto pump unloading/reloading for accumulator & high-low circuits
  • Pressure ranges: B (2.5–7.0 MPa), C (3.5–14 MPa), H (7.0–21 MPa)
  • Max pressure: 21 MPa (3050 PSI)
  • Max flow: BUCG-06: 125 L/min
  • Mounting: Sub-plate (Rc, BSP, NPT)
  • Seal: Phosphate ester fluid compatible
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Unloading Relief Valve.
  • Auto pump unloading/reloading for accumulator & high-low circuits
  • Pressure ranges: B (2.5–7.0 MPa), C (3.5–14 MPa), H (7.0–21 MPa)
  • Max pressure: 21 MPa (3050 PSI)
  • Max flow: BUCG-06: 125 L/min
  • Mounting: Sub-plate (Rc, BSP, NPT)
  • Seal: Phosphate ester fluid compatible
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Unloading Relief Valve.
  • Auto pump unloading/reloading for accumulator & high-low circuits
  • Pressure ranges: B (2.5–7.0 MPa), C (3.5–14 MPa), H (7.0–21 MPa)
  • Max pressure: 21 MPa (3050 PSI)
  • Max flow: BUCG-06: 125 L/min
  • Mounting: Sub-plate (Rc, BSP, NPT)
  • Seal: Phosphate ester fluid compatible
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.
  • Pilot Operated Relief Valve.
  • Reliable overpressure protection with stable pressure control.
  • BT: Threaded / BG: Sub-plate mounting
  • Sizes: 03, 06, 10
  • Flow: Up to 400 L/min (106 US GPM)
  • Fast unload-to-onload response.
  • F-type seals for phosphate ester fluids.
  • Lead times for non-stocked items are generally 18-20 weeks. For urgent needs, please contact us to explore additional options.